This PDF document provides a comprehensive overview of SAP MRP (Material Requirements Planning) procedures, detailing different MRP types, customization settings, planning and execution examples, lot-sizing procedures, and forecast models. It covers traditional MRP, Consumption-Based Planning (CBP), Master Production Schedule (MPS), and various lot-sizing and forecasting methodologies.
Although interfaces, fundamental concepts and functionalities could be outdated due to the advancements in SAP S/4HANA, this document still holds foundational MRP concepts and procedures.
List of document content are;
- MRP Procedure
- MRP Type PD
- MRP Type PP
- MRP Type PV
- MRP Type PW
- MRP Type P6
- MRP Type P7
- MRP Type P8
- MRP Type P9
- MRP Type ZP
- MRP Type Z8
- CBP Type VB Manual Reorder Point
- CBP Type V2 Automatic Reorder Point
- CBP Type R1 or VS Time phased Planning
- MRP Type RS Replenishment retail
- Calculation of lot-sizes for the procurement proposal
- Static lot-sizing procedure
- Periodic lot-sizing procedure
- Optimum lot-sizing procedure
- Other tools in lot-sizing procedure
- Consumption values
- Forecast values
- Forecast execution
- Forecast models
- Creation indicator
- Planning mode
- MRP Storage location with special procurement
- MRP availability check per stock type
- Planning strategy 40 and VE
- Key property of strategy VE and procedure
- Strategy VE example
- Scheduling for externally procured materials
- Scheduling for in-house manufactured materials
- SMT Kanban Procedure (KTEC)
- STT and SRK Kanban Procedure
- SST – GI Year-forecast Procedure