Specialized for a chemical company, this document serves as a reference of SAP PP Step by Step Configuration Guide with screenshots. It covers the configuration steps for BOM (Bill of Material), Resources (Work Centers), and Master Recipe.
- BOM – Bill of Material
- Define BOM Usage
- Define Default Values for item status
- Define Allowed Material type for BOM Header
- Define BOM Status
- Define Item Category
- Define Allowed Material Types for BOM Items
- Define Explosion Types
- Define Order of Priority for BOM Usages
- Define Applications
- Define Alternative Determination for Multiple BOMs
- Alternative Determination in Related Application Area
- Define User-Specific Setting
- Resource
- Define Resource Category (Work Center Category)
- Define Field Selection
- Define Task List Usage
- Define Parameters
- Define Standard Value Key
- Define Formulas for Resources (Work Centers)
- Define Person Responsible
- Define Control Keys
- Define Capacity Category
- Define Capacity Planner
- Define Shift Sequence
- Define Factory calendar
- Define Screen Sequence for Resources (Work Centers)
- Master Recipe
- Define Profiles with Default Values
- Assign Material Types
Download – SAP PP Configuration Guide to BOM, Resources and Master Recipes