eCATT Guides

This is a series of article which will introduce the users to the automated testing tool called eCATT. For easier understanding of the user, the article has bee split into a series of eight articles where the user is given introduction to the eCATT, how the user can record and parameterize the script, the concept behind test data container, system data container and test configurator is explained. For the easier user understanding an attempt has been made to combine eCATT theory with some examples and illustrations. The work of exploration has been mainly on the SAP GUI recording mode. For the other recording modes like TCD, Web Dynpro applications, the user will have to refer the SAP help. The series of the articles are listed below for user reference.

Read more

SAP Basis 10 Days Trainings

Introduction to the R/3 Basis System

Architecture/System landscape.
R/3 Client/Server Architecture.
Instance Concept
Central and Distributed Instances.
Work Process Overview.
Interaction between Work Processes.
Application Services.
Data Structure of SAP.

Read more

Material Master Related Notes in SAP

Abstract:

To implement an integrated system of production planning and materials management, you must have a central database wherein anyone in your company can find out all there is to know about any material passing through the plant.
Everyone must use the same rules and data structures when they enter data about material details.
The integration of all material data in a single database object eliminates redundant data storage. Areas such as purchasing, inventory management, material requirements planning (MRP), invoice verification, and so on, can all use the same data.

Read more

SAP BW Trainings Presentation Documents

SAP BW trainings from a leading consulting company

Contents:

SAP BW Overview and Concepts
Introducing the Administrator Workbench
Data Modeling and Loading
Data Extraction (OLTP and Remote Systems)
The ODS and Business Content
Production Support
BW(BEX) Reporting

Read more

Materials Requirement Planning in SAP

The main function of material requirements planning is to guarantee material availability, that is, it is used to procure or produce the requirement quantities on time both for internal purposes and for sales and distribution. This process involves the monitoring of stocks and, in particular, the automatic creation of procurement proposals for purchasing and production.

In doing so, MRP tries to strike the best balance possible between

  • optimizing the service level and
  • minimizing costs and capital lockup.

    Read more